Electric Bulk Power Transmission and Control
NAICS 221121 · Federal Contracts & Awards
Electric Bulk Power Transmission And Control obligated $280,661,930.51 in FY2024 according to USAspending.gov (NAICS 221121). That yearlyTrend cell is 89.9% of $312,279,010.50. That yearlyTrend cell is about ninety percent of the NAICS 221121 extract — a bulk-power transmission year, not a named-grid roster. The pair is Electric Bulk Power Transmission And Control and FY2024 — not every federal dollar in FY2024, not Electric Bulk Power Transmission And Control’s lifetime book restated as a single year, and not cash already paid. The industry parent lists 137 awards across the published extract; that count is not a FY2024-only row total. Correlation is not causation.
Key figures
- USAspending records $280,661,930.51 in Bulk Power Transmission FY2024 obligations (NAICS 221121).
- That cell is 89.9% of the industry’s $312,279,010.50 extract-wide total.
- 137 is the industry extract award-record count, not a FY2024 census of substations, operators, or named utilities.
- The join is NAICS 221121 × FY2024, not an outlay and not a named-recipient list.
- Cite USAspending.gov; quote NAICS 221121 and FY2024 federal spending if live tables moved.
The Bulk Power Transmission–FY2024 join
The relationship is mechanical: one NAICS code, one fiscal year, one obligation sum. $280,661,930.51 is that sum for Electric Bulk Power Transmission And Control in 2024. It is not Electric Bulk Power Transmission And Control nationwide restated as a single year, not every federal dollar in FY2024, and not an outlay register. The packet does not split transmission from control activities inside 221121. 137 is the industry extract’s award-record count, not a FY2024-only file. Unique recipients are unpublished. This cell is not a megawatt-hour log, a named-grid roster, or a substation inventory.
89.9% locates FY2024 inside NAICS 221121’s $312,279,010.50 extract. Nuclear electric power generation is a separate NAICS. Do not recode 221121 as that parent. Do not divide $280,661,930.51 by 137 and call the result a typical FY2024 contract; the award count is extract-wide. Open NAICS 221121 for the industry table without the year filter, FY2024 federal spending for the year table without the NAICS filter, All industries for the NAICS index, and All spending ties for other pairs. Quote those hubs as parents, not as addends to $280,661,930.51.
How USAspending labels Electric Bulk Power Transmission And Control
USAspending labels industry 221121 as Electric Bulk Power Transmission And Control. That code produced $280,661,930.51 when filtered to FY2024. The industry-wide 221121 hub does not require a 2024 clamp. The fiscal-year hub does not require Bulk Power Transmission. Only this tie applies both filters. The packet does not split transmission from control activities inside 221121.
Correlation is not causation: fiscal year 2024 did not cause $280,661,930.51 by existing on a calendar. Production rates, employment, and named facilities are not packet facts. The join is 221121 × FY2024 only. This cell is not a megawatt-hour log, a named-grid roster, or a substation inventory. Do not invent contractors or award recipients to fill the gap. Campaign donations on FEC tables do not fund this USAspending cell; the datasets are separate.
Full analysis: Electric Bulk Power Transmission And Control federal obligations in FY2024 →
Questions
- How much did Electric Bulk Power Transmission And Control obligate in FY2024?
- USAspending.gov records $280,661,930.51 in Electric Bulk Power Transmission And Control obligations for fiscal year 2024 under NAICS 221121. That amount is a yearlyTrend obligation total, not an outlay and not the industry’s $312,279,010.50 extract-wide sum. The FY2024 slice is 89.9% of that parent. Keep Electric Bulk Power Transmission And Control and FY2024 on the same citation as $280,661,930.51.
- Is $280,661,930.51 the entire 221121 USAspending total?
- No. NAICS 221121’s extract-wide total is $312,279,010.50. The FY2024 slice is 89.9% of that parent. Other fiscal-year rows for the same code are separate cells if they exist. Do not add the parent hub into this join. Obligations of $280,661,930.51 are not outlays. 137 is extract-wide for NAICS 221121, not a FY2024 firm census.
- Do 137 awards equal 137 Bulk Power Transmission firms in FY2024?
- No. 137 is the Electric Bulk Power Transmission And Control award-record count in this extract, not a FY2024 census of substations, operators, or named utilities. The packet does not split those records by fiscal year or name contractors. Do not divide $280,661,930.51 by 137. USAspending.gov remains the source.
- Do FEC filings explain Electric Bulk Power Transmission And Control obligations in FY2024?
- No. FEC filings do not explain $280,661,930.51. The source is USAspending.gov. Obligations are not outlays, and donations do not fund NAICS 221121 in FY2024. Keep Electric Bulk Power Transmission And Control and FY2024 together. Unique recipients remain unpublished. USAspending.gov remains the source for NAICS 221121 in FY2024.
USAspending.gov NAICS yearlyTrend by fiscal year. Obligations are not outlays. FY figures can be incomplete for the current year.
Industry ties
Companies in the Electric Bulk Power Transmission and Control industry (NAICS code 221121) have received $312.3M in federal contracts, grants, and other awards since FY2024, across 137 individual awards tracked through FY2026. The largest funding agency is Department of Energy ($200.4M). Spending is concentrated in Ohio, Missouri, California and 24 other states. All figures below come from USAspending.gov award records.
Total Obligations
$312.3M
Total Awards
137
States
27
Last Updated
Apr 14, 2026
Yearly Spending Trend
Top 50 Awards in Electric Bulk Power Transmission and Control
Largest individual obligations in NAICS 221121.
| Award | Recipient | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|---|
CONT_AWD_DEAC0503OR22988_8900_-NONE-_-NONE- OVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTA… | OHIO VALLEY ELECTRIC CORPORATION Ohio | Department of Energy Department of Energy | — | PIKETON, OH-02 | 2024 | $200,023,017 |
CONT_AWD_DABT6702C0007_9700_-NONE-_-NONE- POM ELECTRIC | PACIFIC ENERGY FUELS COMPANY California | Department of Defense Department of the Army | — | MONTEREY, CA-19 | 2024 | $29,578,846 |
CONT_AWD_15F06723C0001296_1549_-NONE-_-NONE- ELECTRICAL UTILITY SERVICES FOR THE FBI ACADEMY LOCATED IN QUANTICO, VA. | DOMINION ENERGY, INC. Virginia | Department of Justice Federal Bureau of Investigation | — | QUANTICO, VA-07 | 2024 | $14,320,780 |
CONT_AWD_0001_9700_N6945014G0012_9700 INCORPORATE THE NOTICE OF ASSIGNMENT, INSTRUMENT OF ASSIGNMENT, AND NOVATION AGREEMENT. | GULF POWER COMPANY Florida | Department of Defense Department of the Navy | — | MILTON, FL-01 | 2024 | $9,804,295 |
CONT_AWD_15F06726C0000136_1549_-NONE-_-NONE- QUANTICO ELECTRIC | VIRGINIA ELECTRIC AND POWER COMPANY Virginia | Department of Justice Federal Bureau of Investigation | — | QUANTICO, VA-07 | 2026 | $4,665,234 |
CONT_AWD_W909MY25F0038_9700_W909MY25D0001_9700 DELIVERY ORDER PREPARES FOR THE PROCUREMENT OF THE FOLLOWING COMPONENTS: THE IMPROVED PRIMARY SWITCHING CENTER, THE IMPROVED SECONDARY DISTRIBUTION CENTER-1, 1, THE IMPROVED SECON… | PD POWER SYSTEMS, LLC Virginia | Department of Defense Department of the Army | — | SPRINGFIELD, VA-11 | 2025 | $3,289,259 |
CONT_AWD_W911S725FA221_9700_W911S725DA006_9700 SHOME JULY 2025 FUNDING | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $2,016,298 |
CONT_AWD_W911S725FA242_9700_W911S725DA006_9700 SHOME AUGUST FUNDING 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,895,577 |
CONT_AWD_W911S724F5009_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,850,098 |
CONT_AWD_W911S724F5010_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,841,756 |
CONT_AWD_W911S725FA187_9700_W911S725DA006_9700 SHOME JUNE FUNDING | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,812,114 |
CONT_AWD_W911S724F5008_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,774,671 |
CONT_AWD_W911S725FA341_9700_W911S725DA006_9700 SHOME SEPTEMBER FUNDING 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,729,593 |
CONT_AWD_W911S724F5011_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,635,612 |
CONT_AWD_W911S724F5007_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,624,566 |
CONT_AWD_W911S725FA174_9700_W911S717D0205_9700 SHOME MAY FUNDING 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,571,669 |
CONT_AWD_W911S723F5311_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,548,062 |
CONT_AWD_W911S725FA013_9700_W911S717D0205_9700 SHOME POWER ELECTRIC FUNDING JANUARY 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,504,191 |
CONT_AWD_W911S725F5101_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,495,940 |
CONT_AWD_W911S725FA066_9700_W911S717D0205_9700 SHOME ELECTRIC MARCH FUNDING 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,484,209 |
CONT_AWD_W911S724F5003_9700_W911S717D0205_9700 DEMAND CHARGE. BASE LOAD CAPACITY. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,452,747 |
CONT_AWD_W911S725FA118_9700_W911S717D0205_9700 SHOME APRIL FUNDING 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,451,283 |
CONT_AWD_W911S724F5006_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,447,392 |
CONT_AWD_W911S724F5000_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,411,898 |
CONT_AWD_W911S725FA031_9700_W911S717D0205_9700 SHO-ME ELECTRIC FUNDING FEBRUARY 2025 | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,405,898 |
CONT_AWD_W911S724F5005_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,395,918 |
CONT_AWD_W911S725F5102_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,385,490 |
CONT_AWD_W911S725F5103_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2025 | $1,382,862 |
CONT_AWD_W911S724F5004_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,354,807 |
CONT_AWD_W911S724F5001_9700_W911S717D0205_9700 ENERGY RATE. ALL REQUIREMENTS. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,311,952 |
CONT_AWD_W911S724F5002_9700_W911S717D0205_9700 DEMAND CHARGE. BASE LOAD CAPACITY. | SHO-ME POWER ELECTRIC COOPERATIVE Missouri | Department of Defense Department of the Army | — | FORT LEONARD WOOD, MO-04 | 2024 | $1,308,659 |
CONT_AWD_FA500020C0003_9700_-NONE-_-NONE- (A) SPECIFIC PREMISES TO BE SERVED: LOCATION #1, POINT BARROW LONG RANGE RADAR SITE (B) ESTIMATED SERVICE:ESTIMATED MAXIMUM DEMAND: 225 KW.ESTIMATED ANNUAL CONSUMPTION: 1,028,090… | BARROW UTILITIES AND ELECTRIC COOPERATIVE INC. Alaska | Department of Defense Department of the Air Force | — | BARROW, AK-00 | 2024 | $1,242,728 |
CONT_AWD_15A00025CAQA00074_1560_-NONE-_-NONE- ELECTRIC UTILITY SERVICES LOCATED AT: 1. NATIONAL LABORATORY CENTER (NLC), 6000 AMMENDALE ROAD, BELTSVILLE, MD 20705. | POTOMAC ELECTRIC POWER CO District of Columbia | Department of Justice Bureau of Alcohol, Tobacco, Firearms and Explosives Acquisition and Property Management Division | — | WASHINGTON, DC-98 | 2025 | $1,114,956 |
CONT_AWD_W912L711C0001_9700_-NONE-_-NONE- FY25 MONTLHY TARIFF | CITY OF ALCOA Tennessee | Department of Defense Department of the Army | — | ALCOA, TN-02 | 2024 | $1,063,917 |
CONT_AWD_15B61225P00000033_1540_-NONE-_-NONE- ELECTRIC UTILITY SERVICE FOR FY25 | PORTLAND GENERAL ELECTRIC COMPANY Oregon | Department of Justice Federal Prison System / Bureau of Prisons | — | PORTLAND, OR-01 | 2025 | $771,321 |
CONT_AWD_HHSD211201896218C_7523_-NONE-_-NONE- ELECTRICITY SERVICES MORGANTOWN | MONONGAHELA POWER COMPANY West Virginia | Department of Health and Human Services Centers for Disease Control and Prevention | — | MORGANTOWN, WV-02 | 2024 | $719,317 |
CONT_AWD_75D30119C03620_7523_-NONE-_-NONE- ELECTRICITY SERVICES MORGANTOWN | MONONGAHELA POWER COMPANY West Virginia | Department of Health and Human Services Centers for Disease Control and Prevention | — | MORGANTOWN, WV-02 | 2024 | $644,473 |
CONT_AWD_15UC0C25P00002171_1542_-NONE-_-NONE- PUBLICE UTILITIES FOR CENTRAL OFFICE | PEPCO HOLDINGS LLC District of Columbia | Department of Justice Federal Prison Industries / Unicor | — | WASHINGTON, DC-98 | 2025 | $600,000 |
CONT_AWD_80JSC020P0042_8000_-NONE-_-NONE- IMPROVEMENTS TO CENTERPOINT TRANSMISSION LINES | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC Texas | National Aeronautics and Space Administration National Aeronautics and Space Administration | — | HOUSTON, TX-18 | 2024 | $570,406 |
CONT_AWD_15UC0C24P00002192_1542_-NONE-_-NONE- PUBLICE UTILITIES FOR CENTRAL OFFICE | PEPCO HOLDINGS LLC District of Columbia | Department of Justice Federal Prison Industries / Unicor | — | WASHINGTON, DC-98 | 2024 | $495,000 |
CONT_AWD_89303318CEM000033_8900_-NONE-_-NONE- DOE PORTSMOUTH PADUCAH PROJECT OFFICE (PPPO) POWER RELIABILITY SERVICES AGREEMENT. | PJM INTERCONNECTION, L.L.C. Pennsylvania | Department of Energy Department of Energy | — | PIKETON, OH-02 | 2024 | $406,000 |
CONT_AWD_W912PB25F3055_9700_W912PB24D3024_9700 RECURRING MAINTENANCE | HONEYWELL BUILDING SOLUTIONS GMBH | Department of Defense Department of the Army | — | — | 2025 | $402,541 |
CONT_AWD_FA488525C0007_9700_-NONE-_-NONE- AN-C UTILITIES (ELECTRICITY) | AL NAKHLA INVESTMENT COMPANY | Department of Defense Department of the Air Force | — | — | 2025 | $231,440 |
CONT_AWD_19NU7026P0055_1900_-NONE-_-NONE- OEM BREAKER PARTS FOR COMPOUND SWITCHGEAR. | SIEMENS INDUSTRY INC Illinois | Department of State Department of State | — | BELTSVILLE, MD-04 | 2026 | $217,352 |
CONT_AWD_INR16PX00965_1425_-NONE-_-NONE- THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENT… | CITY OF FARMINGTON New Mexico | Department of the Interior Bureau of Reclamation | — | NAVAJO DAM, NM-03 | 2024 | $199,017 |
CONT_AWD_N6449824P5176_9700_-NONE-_-NONE- PEDESTAL BEARING | RENK AMERICA LLC Michigan | Department of Defense Department of the Navy | — | MUSKEGON, MI-02 | 2024 | $160,033 |
CONT_AWD_19SA2024P0126_1900_-NONE-_-NONE- BREAKERS & RECEPTACLES (FAC) | MIL SERVE INTERNATIONAL INC Texas | Department of State Department of State | — | AUSTIN, TX-25 | 2024 | $155,992 |
CONT_AWD_140A2320P0418_1450_-NONE-_-NONE- UTILITIES: ELECTRIC, WATER, AND SEWER. | TOHONO OODHAM UTILITY AUTHORITY Arizona | Department of the Interior Bureau of Indian Affairs and Bureau of Indian Education | — | SELLS, AZ-07 | 2024 | $138,846 |
CONT_AWD_36C24625P1275_3600_-NONE-_-NONE- EMERGENCY: EMERGENCY PORTABLE GENERATOR RENTAL | BITTING ELECTRIC, INC. North Carolina | Department of Veterans Affairs Department of Veterans Affairs | — | MORRISVILLE, NC-04 | 2025 | $135,335 |
CONT_AWD_19J01020P1883_1900_-NONE-_-NONE- GENERATORS MAINTENANCE | JORDAN TRACTOR & EQUIPMENT COMPANY LIMITED | Department of State Department of State | — | — | 2024 | $120,057 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Top Funding Agencies
View All→Top Recipients
View All→Spending by State
| State | Funding | Awards |
|---|---|---|
| Ohio | $200.4M | 2 |
| Missouri | $39.1M | 25 |
| California | $29.6M | 2 |
| Virginia | $22.5M | 5 |
| Florida | $9.8M | 3 |
| District of Columbia | $2.2M | 4 |
| West Virginia | $1.4M | 2 |
| Alaska | $1.2M | 1 |
| Tennessee | $1.1M | 1 |
| Texas | $797K | 6 |
| Oregon | $771K | 3 |
| Maryland | $296K | 3 |
| New Mexico | $287K | 3 |
| North Carolina | $218K | 3 |
| Michigan | $160K | 1 |
| Arizona | $139K | 1 |
| Nevada | $133K | 2 |
| Illinois | $119K | 3 |
| Guam | $53K | 1 |
| New York | $44K | 1 |
| South Carolina | $41K | 1 |
| Wisconsin | $35K | 1 |
| Colorado | $18K | 1 |
| Massachusetts | $15K | 2 |
| Alabama | $12K | 1 |
| Puerto Rico | $5K | 2 |
| Pennsylvania | $0 | 1 |
Source: USAspending.gov · All Industries