Skip to main content
← All data ties

Prefabricated Metal Building And Component Manufacturing, FY2025

Prefabricated Metal Building And Component Manufacturing obligated $223,617,547.98 in FY2025 according to USAspending.gov (NAICS 332311). That yearlyTrend cell is 33.3% of the industry extract $671,988,113.09. The page is a join of one NAICS code and one fiscal year, not a building catalog, a plant map, or a named-builder roster. 1,283 is the industry extract's award-record count, not a FY2025-only census of buildings, plants, or named makers.

Key figures

  • USAspending records $223,617,547.98 in Prefabricated Metal Building And Component Manufacturing FY2025 obligations (NAICS 332311).
  • That cell is 33.3% of the industry's $671,988,113.09 extract-wide total.
  • 1,283 is the industry extract award-record count, not a FY2025 census of buildings, plants, or named makers.
  • Obligations are not outlays; FEC donations do not fund this total.

NAICS 332311 joined with fiscal year 2025

The relationship is mechanical: NAICS 332311 crossed with fiscal year 2025 yields one obligation sum. $223,617,547.98 is that sum for Prefabricated Metal Building And Component Manufacturing in 2025. USAspending.gov publishes the figure as a yearlyTrend obligation total. Obligations are commitments recorded on awards, not Treasury outlays. The industry-wide extract remains $671,988,113.09; the FY2025 hub remains a separate parent. This pair does not explain why agencies bought prefabricated metal building and component manufacturing on awards, and it does not name contractors or award recipients.

Nothing in the facts supports reading $223,617,547.98 as a count of buildings, plants, or named makers. Fabricated structural metal manufacturing (NAICS 332312) is a different metal-fabrication code. Correlation between this NAICS label and FY2025 spending is the join itself, not a causal story. Campaign-finance tables do not fund these USAspending obligations. Place-of-performance and awarding-agency splits are omitted from this packet.

Prefabricated-building dollars inside FY2025

On the industry side, NAICS 332311 is the Prefabricated Metal Building And Component Manufacturing extract. Its published total across the extract is $671,988,113.09. $223,617,547.98 sits inside that book at 33.3%; the other fiscal-year rows for the same code sum to $448,370,565.11 in this arithmetic. The parent industry page holds the longer series without isolating 2025. Award records in the extract number 1,283; that count is not limited to FY2025.

Prefabricated metal building and component manufacturing on awards is the NAICS description attached to the awards, not a proof of goods delivered. A later USAspending ingest can restate $223,617,547.98 or $671,988,113.09 without changing the join keys. Do not add the all-industries index into this cell. The 33.3% share is $223,617,547.98 divided by $671,988,113.09, not a budget score or a ranking of industries.

1,283 records are not 1,283 buildings

1,283 award records are not 1,283 units of buildings, plants, or named makers. The count rides with the Prefabricated Metal Building And Component Manufacturing extract, not with a FY2025-only slice. Modifications, deobligations, and multiple lines can inflate row counts. Unique recipients stay unpublished. A per-award mean from $223,617,547.98 and 1,283 would mix a FY2025 dollar total with an extract-wide record count. This packet does not publish a FY2025-only award-record count for NAICS 332311.

What this prefab-building cell omits

What the table is: USAspending.gov NAICS yearlyTrend for Prefabricated Metal Building And Component Manufacturing (NAICS 332311) in fiscal year 2025, totaling $223,617,547.98. What the table is not: an outlay register, a building catalog, a plant map, a named-builder roster, an agency split, a map, or an FEC-funded pipeline. Public records, not accusations. Fabricated structural metal manufacturing (NAICS 332312) is a different metal-fabrication code.

Do not treat 33.3% as evidence that FY2025 dominated prefabricated metal building and component manufacturing on awards in a causal sense. The share is arithmetic on two packet totals. Named contractors and award recipients are absent from the facts. Quote NAICS 332311, FY2025, and $223,617,547.98 together. The remainder of the extract after FY2025 is $448,370,565.11 in this arithmetic, still not an outlay.

Parents for NAICS 332311 and FY2025

Four hrefs ship with the packet: /industries/332311/ (NAICS 332311), /fiscal-years/2025/ (FY2025 federal spending), /industries/ (All industries), and /ties/ (All spending ties). Use them as parents, not as this cell. Original filings remain on USAspending.gov for this 332311 × FY2025 pair.

Keep Prefabricated Metal Building And Component Manufacturing and FY2025 together when citing $223,617,547.98. NAICS 332311's extract-wide award-record count is 1,283, not a FY2025 census of buildings, plants, or named makers. Obligations of $223,617,547.98 are not outlays. The 33.3% share uses the extract-wide $671,988,113.09 as the denominator. Agency and geography splits are omitted. A later ingest can restate $223,617,547.98 without changing NAICS 332311 or fiscal year 2025.

On the year side, fiscal year 2025 is the second join key. $223,617,547.98 is Prefabricated Metal Building And Component Manufacturing inside FY2025, not all federal obligations recorded for that year. Other NAICS codes have their own FY2025 cells. The fiscal-year parent lists government-wide context without this industry filter. FY figures can be incomplete or later restated; the source note on this packet says so.

Keep Prefabricated Metal Building And Component Manufacturing, NAICS 332311, FY2025, and $223,617,547.98 in one citation. Dropping the year turns the figure into the extract-wide $671,988,113.09. Dropping the NAICS turns it into a year hub that is not this join. Outlays remain unpublished here.

Questions

How much did Prefabricated Metal Building And Component Manufacturing obligate in FY2025?
USAspending.gov records $223,617,547.98 in Prefabricated Metal Building And Component Manufacturing obligations for fiscal year 2025 under NAICS 332311. That amount is a yearlyTrend obligation total, not an outlay and not the industry's $671,988,113.09 extract-wide sum. The join names both Prefabricated Metal Building And Component Manufacturing and FY2025; it does not name contractors or award recipients.
Is $223,617,547.98 the entire NAICS 332311 USAspending total?
No. NAICS 332311's extract-wide total is $671,988,113.09. FY2025 is 33.3% of that book. Other fiscal-year rows for the same code are separate cells. Do not add the parent hub into this join. Obligations of $223,617,547.98 are not outlays. USAspending.gov remains the source for the 332311 × 2025 pair.
Do 1,283 awards equal 1,283 buildings in FY2025?
No. 1,283 is the Prefabricated Metal Building And Component Manufacturing award-record count in this extract, not a FY2025-only census of buildings, plants, or named makers. The packet does not split those records by fiscal year or name contractors. USAspending.gov remains the source. Unique recipients are unpublished on this join.
Do FEC filings explain Prefabricated Metal Building And Component Manufacturing obligations in FY2025?
No. FEC filings do not explain $223,617,547.98. The source is USAspending.gov. Obligations are not outlays, and donations do not fund NAICS 332311 in FY2025. The pair is NAICS 332311 plus fiscal year 2025. Campaign-finance tables are a different dataset from this yearlyTrend cell.

USAspending.gov NAICS yearlyTrend by fiscal year. Obligations are not outlays. FY figures can be incomplete for the current year.